A 330,000 square foot section of a newly poured parking garage at Planet Hollywood was rejected for various unacceptable issues.  The challenge was to make this area look consistent with the rest of the project.  The expectations were that this parking garage would get extremely high traffic and had multiple sharp turning areas.  The solution had to be very durable to hold up to heavy loading and shear.  It also had to be fast – setting because it was indoors and to enable the parking garage to open for business yesterday.

THE SOLUTION:

NEXT-GEN SURFACING SOLUTION’S CEM – SHIELD SR was placed in multiple layers to shield the concrete surface and minimize future deterioration.   A heavy broom finish was applied to match the rest of the project.  As always, prior to application of the CEM – SHIELD material, all areas were properly prepared; shot blasted, grinded, acid etched, power washed with turbo nozzle, chipped out and leveled as needed.

RESULTS:

The project was done in 1997and as of 2020, the CEM – SHIELD SR surface is still in place.  The original broom finish is strong with only a few locations showing signs of wear.  Planet Hollywood Is extremely happy CEM – SHIELD SR which has dramatically out – performed their expectations. 

BEFORE

AFTER

NEXT - GEN’S CEM - SHIELD SR PROVED THAT IT “SHIELDS” THE CONCRETE SURFACE FROM ALL ENVIRONMENTAL DISTRESS AT THE BEST VALUE PRICE